I 90 WB over US 20 JACOBS LADDER RD

.2MIE.GREENWATER POND B1 · County 003, Massachusetts · Built 1957 · 2 Lanes · 14,824 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B030594G2DOTNBI
Year Built
1957
Reconstructed
1994
Length
46.6 m (152.9 ft)
Max Span
21 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
14,824
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$849,000
Total Project Cost
$1,274,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.