ST 32 MAIN ST over WATER CANAL OVERFLOW

1500 N OF INT PEACH ST · County 027, Massachusetts · Built 1938 · 2 Lanes · 3,800 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
B0200915JMUNNBI
Year Built
1938
Length
7 m (23 ft)
Max Span
6.7 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
3,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,988,000
Total Project Cost
$2,983,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.