ST 32 S BARRE RD over WATER PRINCE RIVER

0.7 MI S OF ST 122 · County 027, Massachusetts · Built 1938 · 2 Lanes · 4,010 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B0200619YDOTNBI
Year Built
1938
Length
20.7 m (67.9 ft)
Max Span
7.6 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
4,010
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,727,000
Total Project Cost
$4,091,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.