HWY CENTRAL ST over WATER AUBURN POND

I-90 OVER CENTRAL ST · County 027, Massachusetts · Built 1957 · 2 Lanes · 3,494 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
A170499YPDOTNBI
Year Built
1957
Length
8.3 m (27.2 ft)
Max Span
3.9 m
Width
56.4 m (185 ft)
Lanes
2
Daily Traffic
3,494
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$590,000
Total Project Cost
$886,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.