US 40 EB OFF RAMP over I-895 SB ON RAMP

MILEPOST M13.13 · County 510, Maryland · Built 1957 · 1 Lanes · 4,627 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
300000BCY132010
Year Built
1957
Length
21.3 m (69.9 ft)
Max Span
20.4 m
Width
7.6 m (24.9 ft)
Lanes
1
Daily Traffic
4,627
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.