I-895 SB over HERRING RUN

MILEPOST M13.7 · County 510, Maryland · Built 1957 · 4 Lanes · 35,344 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
300000BCY139012
Year Built
1957
Reconstructed
2006
Length
54 m (177.2 ft)
Max Span
17.7 m
Width
20.4 m (66.9 ft)
Lanes
4
Daily Traffic
35,344
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.