I 295 SB over Fore River Parkway

0.6 MI N TOWNLINE · County 005, Maine · Built 1974 · 2 Lanes · 29,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
6556
Year Built
1974
Reconstructed
1995
Length
50.4 m (165.4 ft)
Max Span
24.4 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
29,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.