I 295 SB over Congress & Park Streets

Exit 5 · County 005, Maine · Built 1973 · 3 Lanes · 35,330 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
6535
Year Built
1973
Length
63.6 m (208.7 ft)
Max Span
31.3 m
Width
15 m (49.2 ft)
Lanes
3
Daily Traffic
35,330
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.