I 295 NB over FORE RIVER

TOWNLINE · County 005, Maine · Built 1973 · 2 Lanes · 36,530 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
6281
Year Built
1973
Reconstructed
1995
Length
184.6 m (605.6 ft)
Max Span
39.6 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
36,530
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.