MALLETT DR over I 295 NB & SB

INTERCHANGE 22 · County 005, Maine · Built 2025 · 2 Lanes · 16,596 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
5721
Year Built
2025
Length
43.9 m (144 ft)
Max Span
21 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
16,596
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.