DESERT RD over I 295 NB & SB

INTERCHAGE 20 · County 005, Maine · Built 2025 · 2 Lanes · 9,251 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
5720
Year Built
2025
Length
47.2 m (154.9 ft)
Max Span
22.9 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
9,251
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.