PINE POINT RD over B&M RR & SNOW CANNING RD

2.7 MI SE US 1 · County 005, Maine · Built 2016 · 2 Lanes · 5,075 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
5260
Year Built
2016
Length
37.2 m (122 ft)
Max Span
18.2 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
5,075
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.