US 1 over DUNSTAN RIVER

0.7 MI NE RTE 9 JCT US1 · County 005, Maine · Built 2004 · 4 Lanes · 22,357 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
2240
Year Built
2004
Length
13.5 m (44.3 ft)
Max Span
2.4 m
Lanes
4
Daily Traffic
22,357
Material
Other
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.