CENTER BRIDGE RD over ANDROSCOGGIN RIVER

2.2 MI ELY RTE 117 · County 001, Maine · Built 2014 · 2 Lanes · 2,631 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
3426
Year Built
2014
Length
148.6 m (487.5 ft)
Max Span
73.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,631
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.