TIDSWELL RD over MARTIN STREAM

0.1 MI E RT 4 · County 001, Maine · Built 2020 · 2 Lanes · 564 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
0007
Year Built
2020
Length
7.3 m (24 ft)
Max Span
7.3 m
Lanes
2
Daily Traffic
564
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.