I-95(NB) over MOUSAM RIVER

0.545 mi W of SR 35 · County 031, Maine · Built 1948 · 3 Lanes · 25,580 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
1331
Year Built
1948
Reconstructed
1989
Length
100.6 m (330.1 ft)
Max Span
39.6 m
Width
20 m (65.6 ft)
Lanes
3
Daily Traffic
25,580
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.