HIGH ST./RTE. 9A over I-95

0.174 mi W of Harrisecket · County 031, Maine · Built 2001 · 2 Lanes · 2,760 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1329
Year Built
2001
Length
74.2 m (243.4 ft)
Max Span
37.1 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
2,760
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.