MOUSE LN over MIDDLE BR MOUSAM RIVER

0.2 MI NE OF NEW DAM RD · County 031, Maine · Built 1907 · 2 Lanes · 613 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
1265
Year Built
1907
Reconstructed
1996
Length
8.4 m (27.6 ft)
Max Span
7.7 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
613
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.