NEW DAM RD over MOUSAM RIVER

2.6 MI E RTE 4 · County 031, Maine · Built 1980 · 2 Lanes · 2,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1262
Year Built
1980
Length
23 m (75.5 ft)
Max Span
21.3 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
2,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.