Carr Dr over CANAL

INT. OF CARR DR AND US 11 · County 103, Louisiana · Built 2010 · 2 Lanes · 502 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
625200000107034
Year Built
2010
Length
48.2 m (158.1 ft)
Max Span
5.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
502
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.