I0010 over LAKE PONTCHARTRAIN

2.6 MILES FROM BEGINNING · County 071, Louisiana · Built 2011 · 1 Lanes · 33,925 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
023600000020479
Year Built
2011
Length
15.2 m (49.9 ft)
Max Span
15.2 m
Width
42.7 m (140.1 ft)
Lanes
1
Daily Traffic
33,925
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.