E Flanacher Rd over DRAINAGE CANAL
0.7 MI E OF US 61 · County 033, Louisiana · Built 1968 · 2 Lanes · 933 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
3
Serious
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 3 | Serious |
| Substructure | 3 | Serious |
Location
30.66765, -91.250678
This bridge is in worse condition than 92.5% of bridges in County 033. The average bridge in Louisiana is 0 years old; this one is 58 years old.
Nearby Bridges
E Flanacher Rd over DRAINAGE BAYOU
Built 2018
Port Hudson Cem Rd over COOPER BAYOU REF
Built 1968
Port Hudson Cem Rd over COOPER BAYOU
Built 1968
Plains-Port Hudson over DRAIN BAYOU
Built 1958
LA0064 over BATON ROUGE BAYOU
Built 1993
US0061 over FOSTER CREEK
Built 1961
US0061 over FOSTER CREEK
Built 1982
E Flanacher Rd over DRAINAGE BAYOU
Built 2017
Mt Plesant Zachary over COOPER BAYOU
Built 1966
BARNETT CUT-OFF RD over BAYOU BATON ROUGE
Built 2019
Bridge Details
- Structure #
- 611730402911541
- Year Built
- 1968
- Length
- 11.6 m (38.1 ft)
- Max Span
- 5.8 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 933
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $109,000
- Total Project Cost
- $163,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.