BARNETT CUT-OFF RD over BAYOU BATON ROUGE
0.5 MI S OF LA 64 · County 033, Louisiana · Built 2019 · 2 Lanes · 310 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
30.641911, -91.226403
This bridge is in worse condition than 16.8% of bridges in County 033. The average bridge in Louisiana is 0 years old; this one is 7 years old.
Nearby Bridges
LA0064 over BATON ROUGE BAYOU
Built 1993
Carney Rd over DRAINAGE BAYOU
Built 1965
US 61 over Comite Diversion Canal
Built 2022
Mt Plesant Zachary over COOPER BAYOU
Built 1966
US 61 over Comite Diversion Canal
Built 2022
E Flanacher Rd over DRAINAGE BAYOU
Built 2017
Carney Rd over BAYOU BATON ROUGE
Built 1965
Port Hudson Cem Rd over COOPER BAYOU REF
Built 1968
E Flanacher Rd over DRAINAGE BAYOU
Built 2018
LA 964 over Comite River Diversion
Built 2024
Bridge Details
- Structure #
- 611700000611710
- Year Built
- 2019
- Length
- 21.9 m (71.9 ft)
- Max Span
- 7.3 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 310
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.