US 61 over Comite Diversion Canal
2.0 Mi. S of LA 64 · County 033, Louisiana · Built 2022 · 2 Lanes · 9,721 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
30.619811, -91.233811
This bridge is in worse condition than 13.1% of bridges in County 033. The average bridge in Louisiana is 0 years old; this one is 4 years old.
Nearby Bridges
US 61 over Comite Diversion Canal
Built 2022
Carney Rd over DRAINAGE BAYOU
Built 1965
BARNETT CUT-OFF RD over BAYOU BATON ROUGE
Built 2019
Mt Plesant Zachary over COOPER BAYOU
Built 1966
Carney Rd over BAYOU BATON ROUGE
Built 1965
LA0064 over BATON ROUGE BAYOU
Built 1993
LA 964 over Comite River Diversion
Built 2024
US0061 over BATON ROUGE BAYOU
Built 1979
US0061 over BATON ROUGE BAYOU
Built 1961
Port Hudson Cem Rd over COOPER BAYOU REF
Built 1968
Bridge Details
- Structure #
- 611700000000052
- Year Built
- 2022
- Length
- 106.7 m (350.1 ft)
- Max Span
- 21.3 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 9,721
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.