LA0012 over COWPEN BAYOU

3.3 MI W OF US 171 · County 011, Louisiana · Built 2020 · 2 Lanes · 3,424 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
070600000070600
Year Built
2020
Length
30.5 m (100.1 ft)
Max Span
6.1 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
3,424
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.