Malapart Rd. over MIMS COULEE
0.5M WEST OF LA 182 · County 055, Louisiana · Built 1991 · 2 Lanes · 780 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.290511, -92.058425
This bridge is in worse condition than 27.6% of bridges in County 055. The average bridge in Louisiana is 0 years old; this one is 35 years old.
Nearby Bridges
Birdsong Rd. over GASTON COULEE
Built 1984
Lebesque Rd over Coulee Mine
Built 2019
W. Pont Des Mouton over Gaston Coulee
Built 2006
Landsdowne Way over DRAIN
Built 2008
W. Pont Des Mouton over CANAL
Built 2007
LA0723 over Coulee Mine
Built 2003
I0049 over LA 98 [Gloria Switch Rd]
Built 1981
I0049 over LA 98
Built 1981
Laser Ln. over COULEE
Built 1985
N. Church St. over Coulee
Built 1995
Bridge Details
- Structure #
- 032830173920341
- Year Built
- 1991
- Length
- 12.2 m (40 ft)
- Max Span
- 6.1 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 780
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.