W. Pont Des Mouton over Gaston Coulee

0.1 Mi. W. of La 182 · County 055, Louisiana · Built 2006 · 4 Lanes · 11,091 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
032800000030514
Year Built
2006
Length
6.7 m (22 ft)
Max Span
6.7 m
Width
32.4 m (106.3 ft)
Lanes
4
Daily Traffic
11,091
Material
Prestressed Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.