I-75 over US-25

Exit 59 US25 @ 11.75 MP · County 203, Kentucky · Built 2020 · 6 Lanes · 40,386 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
102B00078N
Year Built
2020
Length
74 m (242.8 ft)
Max Span
33.8 m
Width
39.5 m (129.6 ft)
Lanes
6
Daily Traffic
40,386
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.