I-75 over Green Hill Road

0.4 MI N of Exit 62 · County 203, Kentucky · Built 2018 · 7 Lanes · 47,638 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
102B00076N
Year Built
2018
Length
25.1 m (82.3 ft)
Max Span
22.9 m
Width
43.2 m (141.7 ft)
Lanes
7
Daily Traffic
47,638
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.