I-64 EB OFF RAMP over US 31W WB & I-64 RAMP 4

1.2 MI E OF US 150 · County 111, Kentucky · Built 1975 · 2 Lanes · 58,404 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
056B00302N
Year Built
1975
Length
187.3 m (614.5 ft)
Max Span
28.8 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
58,404
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,536,000
Total Project Cost
$2,535,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.