I-64 EB ON RAMP 2A over TRIMARC & PARKING

150 FT N OF US 31W · County 111, Kentucky · Built 1975 · 1 Lanes · 83,121 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
056B00299N
Year Built
1975
Length
97.2 m (318.9 ft)
Max Span
17.5 m
Width
7.7 m (25.3 ft)
Lanes
1
Daily Traffic
83,121
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,166,000
Total Project Cost
$1,165,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.