FOUNTAIN GR.25.10 over DRAIN

3.4W 2.0S OF CASTLETON · County 155, Kansas · Built 1969 · 2 Lanes · 24 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
000780745105980
Year Built
1969
Length
23.8 m (78.1 ft)
Max Span
5.7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
24
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$460,000
Total Project Cost
$630,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.