FOUNTAIN GR.23.15 over DRAIN
2.0S 4.9W OF CASTLETON · County 155, Kansas · Built 1969 · 2 Lanes · 10 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
37.839472, -98.066556
This bridge is in worse condition than 94.1% of bridges in County 155. The average bridge in Kansas is 0 years old; this one is 57 years old.
Nearby Bridges
RIVERTON RD.8.45 over TRIB. N. FK. NINNESCAH
Built 1979
RIVERTON RD.8.70 over TRIB N FK NINNESCAH RIV
Built 1994
RIVERTON RD.8.95 over DRAIN TO NINNESCAH RIVER
Built 1952
PLEASANT VAL.23.05 over TRIB. N. FORK NINNESCAH
Built 1983
PARALLEL RD.22.50 over STREAM
Built 1997
PLEASANT VAL.24.00 over DRAIN
Built 1978
RS 560 739899 over STREAM
Built 2012
FOUNTAIN GR.21.30 over TRIB. TO NINNESCAH RIVER
Built 1982
FOUNTAIN GR.25.10 over DRAIN
Built 1969
Partridge Rd. over N. FORK NINNESCAH RIVER
Built 1958
Bridge Details
- Structure #
- 000780741105980
- Year Built
- 1969
- Length
- 23.6 m (77.4 ft)
- Max Span
- 5.7 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $600,000
- Total Project Cost
- $710,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.