I 29 NB over FLOYD BLVD

3.0 mi. N of jct. U.S. 75 · County 193, Iowa · Built 2018 · 2 Lanes · 15,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000700310
Year Built
2018
Length
69.2 m (227 ft)
Max Span
32.6 m
Width
19.7 m (64.6 ft)
Lanes
2
Daily Traffic
15,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.