I 29 SB over FLOYD BLVD

3.0 MI. N OF JCT. US 75 · County 193, Iowa · Built 2019 · 3 Lanes · 15,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000053781
Year Built
2019
Length
69.3 m (227.4 ft)
Max Span
32.6 m
Width
19.7 m (64.6 ft)
Lanes
3
Daily Traffic
15,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.