180TH ST over PINE CREEK

077E11803 · County 139, Iowa · Built 2016 · 2 Lanes · 45 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

41.480628, -90.888461

This bridge is in worse condition than 38.2% of bridges in County 139. The average bridge in Iowa is 0 years old; this one is 10 years old.

Nearby Bridges

Bridge Details

Structure #
000000000257401
Year Built
2016
Length
34.4 m (112.9 ft)
Max Span
33.5 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
45
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$30,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.