FM over PINE CREEK

077E11716 · County 139, Iowa · Built 1963 · 2 Lanes · 180 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

41.468547, -90.870033

This bridge is in worse condition than 65.3% of bridges in County 139. The average bridge in Iowa is 0 years old; this one is 63 years old.

Nearby Bridges

Bridge Details

Structure #
000000000257390
Year Built
1963
Length
46.6 m (152.9 ft)
Max Span
17.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
180
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,208,000
Total Project Cost
$1,812,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.