FLEUR DR over RACCOON AND RR
078240800 · County 153, Iowa · Built 1936 · 4 Lanes · 2,825 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
41.581461, -93.642806
This bridge is in worse condition than 94% of bridges in County 153. The average bridge in Iowa is 0 years old; this one is 90 years old.
Nearby Bridges
MLK JR PKWY E/W over RACCOON RIVER
Built 2005
MLK JR PKWY E/W over NB FLEUR RAMP
Built 2004
MLK JR PKWY N over RACOON RIVER FLEUR RR
Built 2004
MLK JR PKWY S over RACOON RIVER FLEUR RR
Built 2004
GRAND AVENUE over MLK PKWY
Built 2004
SW 9TH ST over CHERRY RR MLK PKWY
Built 1967
SW 8TH ST over RR CHERRY MLK JR PKWY
Built 1967
W 19TH ST over I-235
Built 2003
EB I-235 over 28TH STREET
Built 2004
WB I-235 over 28TH STREET
Built 2005
Bridge Details
- Structure #
- 000000000003910
- Year Built
- 1936
- Reconstructed
- 2008
- Length
- 288.6 m (946.9 ft)
- Max Span
- 33.5 m
- Width
- 21.9 m (71.9 ft)
- Lanes
- 4
- Daily Traffic
- 2,825
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000,000
- Total Project Cost
- $1,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.