SW 8TH ST over RR CHERRY MLK JR PKWY
078240900 · County 153, Iowa · Built 1967 · 2 Lanes · 6,875 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
41.579881, -93.62505
This bridge is in worse condition than 94% of bridges in County 153. The average bridge in Iowa is 0 years old; this one is 59 years old.
Nearby Bridges
SW 9TH ST over CHERRY RR MLK PKWY
Built 1967
S.W.3RD ST over RACCOON RIVER
Built 1995
MLK EB over DES MOINES RIVER
Built 2010
SW 7TH ST over RACCOON R & TRAIL
Built 1915
COURT AVE over DES MOINES RIVER
Built 1918
SW 9TH ST over RACCOON RIVER & TRAIL
Built 1967
WALNUT ST over DES MOINES RIVER
Built 1911
MLK WB over DES MOINES RIVER
Built 2010
EAST LOCUST ST over DES MOINES RIVER
Built 2020
SCOTT AVE over DES MOINES RIVER
Built 1937
Bridge Details
- Structure #
- 000000000003974
- Year Built
- 1967
- Reconstructed
- 2006
- Length
- 461.8 m (1515.1 ft)
- Max Span
- 47.9 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 6,875
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $20,000
- Total Project Cost
- $22,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.