CR 900S over HINEN DRAIN

00.15 E CR 750 E · County 183, Indiana · Built 1930 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
9200037
Year Built
1930
Length
7.9 m (25.9 ft)
Max Span
7.1 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
150
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$600,000
Total Project Cost
$750,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.