US 24 EB over ABOITE CREEK

04.11 W I-69 · County 003, Indiana · Built 2024 · 2 Lanes · 19,122 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
006161
Year Built
2024
Length
33.9 m (111.2 ft)
Max Span
12.8 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
19,122
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.