N MAIN STREET over CHRISTIANA CREEK
00.40 S OF SIMONTON STR. · County 039, Indiana · Built 1952 · 2 Lanes · 4,615 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
41.695486, -85.976386
This bridge is in worse condition than 90.6% of bridges in County 039. The average bridge in Indiana is 0 years old; this one is 74 years old.
Nearby Bridges
N MAIN STREET over ST JOSEPH RIVER
Built 1927
CASSOPOLIS STREET over CHRISTIANA CREEK
Built 2001
SIMONTON ST over CHRISTIANA CREEK
Built 1977
BEARDSLEY AVE over CHRISTIANA CREEK
Built 1963
SR 19 over CHRISTIANA CREEK
Built 1988
SHERMAN ST over ST JOSEPH RIVER
Built 1960
JOHNSON STREET SB over ST JOSEPH RIVER
Built 2010
JACKSON ST over ELKHART RIVER
Built 1986
JOHNSON STREET NB over ST JOSEPH RIVER
Built 1994
ELKHART AVE over ELKHART RIVER
Built 1928
Bridge Details
- Structure #
- 2000152
- Year Built
- 1952
- Length
- 16.4 m (53.8 ft)
- Max Span
- 16 m
- Width
- 16.3 m (53.5 ft)
- Lanes
- 2
- Daily Traffic
- 4,615
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,200,000
- Total Project Cost
- $1,600,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.