SHERMAN ST over ST JOSEPH RIVER
00.00 E OF RIVERSIDE DR · County 039, Indiana · Built 1960 · 2 Lanes · 1,188 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.688561, -85.981711
This bridge is in worse condition than 70.5% of bridges in County 039. The average bridge in Indiana is 0 years old; this one is 66 years old.
Nearby Bridges
LEXINGTON AVENUE over ST JOSEPH RIVER
Built 1926
N MAIN STREET over ST JOSEPH RIVER
Built 1927
JACKSON ST over ELKHART RIVER
Built 1986
N MAIN STREET over CHRISTIANA CREEK
Built 1952
ELKHART AVE over ELKHART RIVER
Built 1928
CASSOPOLIS STREET over CHRISTIANA CREEK
Built 2001
SIMONTON ST over CHRISTIANA CREEK
Built 1977
BEARDSLEY AVE over CHRISTIANA CREEK
Built 1963
JOHNSON STREET SB over ST JOSEPH RIVER
Built 2010
JOHNSON STREET NB over ST JOSEPH RIVER
Built 1994
Bridge Details
- Structure #
- 2000151
- Year Built
- 1960
- Reconstructed
- 1979
- Length
- 123.5 m (405.2 ft)
- Max Span
- 27.4 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,188
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,100,000
- Total Project Cost
- $2,800,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.