SR 58 over BRANCH RUNT RUN

02.28 E SR 258 · County 071, Indiana · Built 2023 · 2 Lanes · 700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
021051
Year Built
2023
Length
13.1 m (43 ft)
Max Span
11.8 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
700
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.