SR 58 over BRANCH RUNT RUN

01.89 E SR 258 · County 071, Indiana · Built 1967 · 2 Lanes · 700 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
021040
Year Built
1967
Reconstructed
2022
Length
9.7 m (31.8 ft)
Max Span
9.1 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
700
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.