TILLMAN RD over HIGHLAND DRAIN 4
00.20 W OF S HANNA ST · County 003, Indiana · Built 1966 · 4 Lanes · 12,125 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
3
Serious
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 3 | Serious |
| Substructure | 6 | Satisfactory |
Location
41.017125, -85.129486
This bridge is in worse condition than 98.7% of bridges in County 003. The average bridge in Indiana is 0 years old; this one is 60 years old.
Nearby Bridges
HANNA ST over CURDES TILE ND #1
Built 1980
LOWER HUNTINGTON R over ST MARYS RIVER
Built 1960
FAYETTE DR over NATURAL DRAIN #4
Built 1985
AIRPORT EXPY over ST MARYS RIVER & PARK TR
Built 1972
MULDOON RD over SNYDER DRAIN
Built 1976
FERGUSON RD over NATURAL DRAIN
Built 1972
FERGUSON RD over ST MARYS RIVER
Built 1972
TILLMAN RD over TRIER DRAIN
Built 1975
BELLE VISTA DR over FAIRFIELD DRAIN
Built 2014
PAULDING RD over TRIER DRAIN
Built 1966
Bridge Details
- Structure #
- 0200277
- Year Built
- 1966
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.6 m
- Width
- 20.1 m (65.9 ft)
- Lanes
- 4
- Daily Traffic
- 12,125
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,137,000
- Total Project Cost
- $1,995,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.