MULDOON RD over SNYDER DRAIN
00.30 N FERGUSON ROAD · County 003, Indiana · Built 1976 · 2 Lanes · 1,692 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
40.993611, -85.122711
This bridge is in worse condition than 93% of bridges in County 003. The average bridge in Indiana is 0 years old; this one is 50 years old.
Nearby Bridges
FERGUSON RD over NATURAL DRAIN
Built 1972
FERGUSON RD over ST MARYS RIVER
Built 1972
DODANE RD over SNYDER DRAIN
Built 1978
S ANTHONY EXTENDED over I-469 EB/WB
Built 1990
HANNA ST over CURDES TILE ND #1
Built 1980
US 27 NB over HOUK DITCH
Built 1954
US 27 SB over HOUK DITCH
Built 1977
I-469 WB over ST MARYS RIVER
Built 1990
I-469 EB over ST MARYS RIVER
Built 1990
TILLMAN RD over HIGHLAND DRAIN 4
Built 1966
Bridge Details
- Structure #
- 0200198
- Year Built
- 1976
- Reconstructed
- 1996
- Length
- 20.5 m (67.3 ft)
- Max Span
- 6.8 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,692
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $825,000
- Total Project Cost
- $1,025,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.