SR 37 over DRY FORK CREEK

01.13 S SR 9 · County 053, Indiana · Built 1990 · 2 Lanes · 3,740 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
012540
Year Built
1990
Reconstructed
2022
Length
19.2 m (63 ft)
Max Span
7.4 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
3,740
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.