SR 15 over DEER CREEK
01.84 N US 35 · County 053, Indiana · Built 1938 · 2 Lanes · 7,605 vehicles/day
Overall
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.509392, -85.648892
This bridge is in worse condition than 44.3% of bridges in County 053. The average bridge in Indiana is 0 years old; this one is 88 years old.
Nearby Bridges
CR 100E over DEER CREEK
Built 1967
LINCOLN BLVD over DEER CREEK
Built 1975
SR 9 over DRY FORK CREEK
Built 1940
OLD KOKOMO RD over DEER CREEK
Built 1972
38TH ST over MISSISSINEWA RIVER
Built 1950
EASTRIDGE DR over BROOKHAVEN ADDITION LAKE
Built 1997
WATER ST over BACK CREEK
Built 1994
SR 15 over BACK CREEK
Built 1938
FIRST ST over WALNUT CREEK
Built 1964
PEARL ST over BACK CREEK
Built 1965
Bridge Details
- Structure #
- 003900
- Year Built
- 1938
- Reconstructed
- 1982
- Length
- 37.9 m (124.3 ft)
- Max Span
- 15.2 m
- Width
- 14.1 m (46.3 ft)
- Lanes
- 2
- Daily Traffic
- 7,605
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.