I-24 RAMP 0.94 over I-57

PULLEYS MILL INTER · County 199, Illinois · Built 1972 · 1 Lanes · 100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
100005900000000
Year Built
1972
Length
85.1 m (279.2 ft)
Max Span
36.3 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.